Key takeaways
- HVAC installation covers more than fitting units: a brief and heat load calculation, permissions, ductwork and pipework, units and controls, then commissioning, F-gas records and handover.
- Several trades are involved. The refrigerant side needs a qualified technician working for an F-gas certified company in Great Britain; in England a competent person scheme member can self-certify building regulations work.
- We found no published installed price for a commercial HVAC system on 25 November 2026. This guide lists what drives the price and what to ask for in a quote.
- For a system above 12 kW in England and Wales, the first inspection is due within five years of the system first going into service. Our commercial air conditioning guide covers the system types.
Who does what
- Building services engineer or designer: sets the design and heat load.
- Mechanical contractor: installs ductwork, pipework and plant.
- F-gas certified company: handles any refrigerant. GOV.UK says a company servicing equipment for others “must be certified by an approved body”, and individuals must hold qualifications to “install new systems”.
- Electrician: the supply and controls wiring.
- Competent person scheme (England): GOV.UK says “You do not need to get approval yourself if you use someone registered with a competent person scheme”, and for mechanical ventilation and air-conditioning systems in buildings other than dwellings it lists BESCA, Blue Flame Certification, Certsure and NAPIT (updated 17 September 2026).
See choosing an HVAC company. This is general information, not legal advice. For adding units to an occupied building, see commercial air conditioning installation; for homes, air conditioning installation.
Step by step
Brief and survey
Give the designer floor plans, ceiling heights, people, equipment, hours of use and what fresh air the building has. Ask for a heat load calculation.
Choose the system
Split, multi split, cassette, VRF, chilled water with fan coil units, or air handling units with ducts. The types are compared in our commercial air conditioning guide, with fan coil units and VRF explained separately.
Permissions
- Planning (England). Planning Portal says air source heat pumps on non-domestic land “are likely to require an application” for planning permission, and Part 14 of the General Permitted Development Order’s Class G covers air source heat pumps only on a dwellinghouse or block of flats, and we found no Part 14 class for air source units on non-domestic buildings (we did not search other Parts), so assume you need permission. Ask the council. Other nations were not checked.
- Building regulations (England). GOV.UK lists “put in a fixed air-conditioning system” among projects that may need approval. Other nations were not checked.
- Landlord consent. Check your lease or tenancy agreement and ask the landlord.
First fix: ductwork, pipework, cabling, condensate
BESA says DW/144 is the specification for sheet metal ductwork in commercial and industrial air systems up to 70 °C, with pressure classes A to D (A low pressure up to 500 Pa, D high pressure up to 2,000 Pa) and leakage testing mandatory for high-pressure ductwork. See HVAC ductwork. Condensate must be drained: Daikin’s Round Flow cassette has a standard drain pump with 675 mm lift.
Second fix: units, controls, building management
Fit the indoor and outdoor units, connect controls and any building management system, and fit filters; see HVAC filters.
Commissioning, F-gas records and handover
Commissioning proves the system does what was designed. GOV.UK says a leak found must be repaired as soon as possible and the test repeated within a month; Article 6(2) of the F-gas Regulation says operators “shall keep the records” “for at least five years”. Ask for the refrigerant type and charge for your records, plus commissioning records, warranties and operating manuals.
After handover: the first inspection
In England and Wales, regulation 18 says the first inspection of a system first put into service on or after 1 January 2008 must take place before “the last day of the period of five years” beginning with the date it is first put into service. Example, our date arithmetic: a system first put into service on 1 March 2027 needs its first inspection by 29 February 2032. This applies only if the system’s effective rated output is more than 12 kW; see TM44 inspections.
Costs
We found no published installed price for a commercial HVAC system. What drives it: system type and capacity; number and type of indoor units; pipe, duct and cable runs and routes; where the outdoor unit goes and any access equipment; the electrical supply; condensate drainage; controls and building management integration; fresh air ventilation; planning and building regulations; out-of-hours working and making good; removing old equipment and recovering its refrigerant (F-gas certified); commissioning and handover; and VAT.
VAT: HMRC’s 0% rate for energy-saving materials applies to “residential accommodation” and certain charity buildings, so a business installation pays 20% on our reading of Notice 708/6 (the notice names hotels, hospitals and prisons as standard rated but does not name offices or shops; we did not confirm whether the position differs between nations). See VAT on air conditioning.
Tax: HMRC’s Capital Allowances Manual refers to “A space or water heating system, a powered system of ventilation, air cooling or air purification” among integral features, and GOV.UK says the Annual Investment Allowance of £1 million covers “most plant and machinery up to the AIA amount”. Ask your accountant how your system is treated; we compute no tax figure, and we did not confirm whether either rule differs between nations. For home installation prices see air conditioning installation cost, which is not a commercial price.
How long it takes
We found no published duration for a commercial HVAC installation. It depends on scope, so ask for a programme in writing.
How to brief an installer
- Floor plans, ceiling heights, people, equipment and hours of use for each room.
- Which rooms need heating, cooling and fresh air.
- Where an outdoor unit or plant room could go, and whether the landlord and council allow it.
- Your electrical supply details, and details of any existing system: make, model, refrigerant and age.
- Ask in writing for a heat load calculation, make and model of every unit with its SEER, the F-gas certificate number, the competent person scheme, what the price excludes, warranty and servicing terms, and the refrigerant charge.
Frequently asked questions
What does HVAC installation include?
Design, ductwork and pipework, units, controls, commissioning and handover documents.
Do I need building regulations approval?
In England, GOV.UK lists fitting a fixed air-conditioning system among projects that may need approval, and says you do not need to apply yourself if you use a competent person scheme installer. Other nations were not checked.
Do I need planning permission?
In England, Planning Portal says air source heat pumps on non-domestic land “are likely to require an application”. Ask the council before you order. See air conditioning planning permission and building regulations.
Who can install the refrigerant side?
A qualified technician working for an F-gas certified company in Great Britain.
Is HVAC equipment tax deductible?
HMRC lists a powered system of air cooling among integral features, and the Annual Investment Allowance is £1 million. Ask an accountant.
What paperwork should I get at handover?
Commissioning records, F-gas records with the refrigerant charge, warranties and operating manuals, and a note of when the first inspection falls due.
Sources
- GOV.UK: Company certification to work with F gas (checked 25 November 2026)
- GOV.UK: Qualifications to work with F gas (updated 3 March 2026) (checked 25 November 2026)
- GOV.UK: Competent person schemes, current schemes (updated 17 September 2026) (checked 25 November 2026)
- GOV.UK: Building regulations approval, when you need approval (checked 25 November 2026)
- Planning Portal: Heat pumps, non-domestic (England) (checked 25 November 2026)
- legislation.gov.uk: General Permitted Development Order 2015, Schedule 2, Part 14 (checked 25 November 2026)
- BESA: Sheet metal ductwork standards (11 November 2025) (checked 25 November 2026)
- Daikin UK: Round Flow FCAG-B (checked 25 November 2026)
- GOV.UK: Checking F gas equipment for leaks (checked 25 November 2026)
- legislation.gov.uk: F-gas Regulation (EU) No 517/2014 as it applies in Great Britain, Article 6 (checked 25 November 2026)
- legislation.gov.uk: Energy Performance of Buildings (England and Wales) Regulations 2012, regulation 18 (checked 25 November 2026)
- GOV.UK: Air conditioning inspections for buildings, a guide (updated 5 November 2026) (checked 25 November 2026)
- HMRC: VAT on energy-saving materials and heating equipment (Notice 708/6) (checked 25 November 2026)
- HMRC: Capital Allowances Manual CA22330, integral features (checked 25 November 2026)
- GOV.UK: Annual Investment Allowance (checked 25 November 2026)