Key takeaways
- HVAC maintenance is partly a legal duty and partly contract. The law sets F-gas leak checks by the refrigerant’s CO2 equivalent from 5 tonnes (Great Britain) and an inspection at least every five years above 12 kW (England and Wales); HSE’s guidance covers legionella control for cooling towers and evaporative condensers, and says ventilation systems should be maintained in line with manufacturers’ instructions. A service beyond that is a matter for the maker’s warranty terms and your maintenance contract.
- How often to service is set by the maker’s manual and your contract. One installer says an annual contract “will typically include two preventative maintenance visits per annum”.
- The only commercial service prices we found are one installer’s: Molesey Air’s “Commercial AMS from £90”, with VAT on top. We found no published price for a planned maintenance contract.
- Keep the records: F-gas records for at least five years, the inspection report, service sheets and any legionella assessment.
What the law requires, and what is good practice
This is general information, not legal advice. Each point names the nation. It sits within our wider commercial air conditioning guide; for a single service visit see commercial air conditioning servicing, and for home owner tasks see air conditioning maintenance and air conditioning service.
F-gas leak checks and records (Great Britain)
Leak checks are required from 5 tonnes CO2 equivalent (about 7.4 kg of R32): at least every 12 months, or 24 with a leak detection system; every 6 months from 50 tonnes, or 12 with one. Equipment of 500 tonnes or more must have a leak detection system and is then checked at least every 6 months (Articles 4 and 5 of the F-gas Regulation as it applies in Great Britain). GOV.UK says if you find a leak you “must repair it as soon as possible and repeat the test within a month”, and that users of equipment and technicians share responsibility. Article 6(2) says operators “shall keep the records” “for at least five years”. Tonnes CO2e = charge in kg x GWP / 1,000.
| Step | R32 (GWP 675) | R410A (GWP about 2,088) |
|---|---|---|
| 5 tonnes: checks at least every 12 months | 7.41 kg | 2.39 kg |
| 50 tonnes: checks at least every 6 months | 74.07 kg | 23.95 kg |
| 500 tonnes: leak detection system required | 740.74 kg | 239.46 kg |
R410A’s figure is the US EPA’s, updated 2 April 2026, used here for illustration only; we did not check the figure the GB F-gas Regulation uses for this blend, so ask your engineer for the system’s CO2 equivalent. Example: a system holding 30 kg of R410A is 30 x 2,088 / 1,000 = 62.6 tonnes CO2e, which is above the 50 tonne step, so checks at least every six months (12 with a leak detection system). The charge is on the outdoor unit’s rating plate. See F-gas regulations.
Inspection every five years above 12 kW (England and Wales)
GOV.UK’s guide (updated 5 November 2026) says inspections cover “All air conditioning systems with an effective rated output of greater than 12kW” and must be “no more than 5 years apart”. The report “must be kept in a safe place” and handed to anyone taking over. See TM44 inspections. Scotland and Northern Ireland have their own rules.
Legionella (HSE guidance; nations not confirmed)
HSE lists “cooling tower and evaporative condensers” among the most common sources and does not name air conditioning. Its evaporative cooling page (updated 14 January 2026) says “If you have a cooling tower or evaporative condenser, you should put in place appropriate measures to prevent or control the” risk. We found no source on air-cooled splits, so we say nothing about them beyond that HSE does not list them.
Ventilation (England, Wales, Scotland)
HSE’s improving-ventilation page says to “make sure they’re maintained in line with manufacturers’ instructions”.
Workplace temperature
Regulation 7(1) says the temperature “shall be reasonable” and 7(3) says “A sufficient number of thermometers shall be provided”. On a maximum, HSE says “There’s no law for maximum working temperature, or when it’s too hot to work, because every workplace is different.”
Planned preventative maintenance (PPM)
Server Room Environments, an installer, says “An annual AC maintenance contract will typically include two preventative maintenance visits per annum”, that twice a year is the recommendation for unit resilience and warranty validity, and that sites with polluted air, extreme temperatures or severe weather may need “three or more service visits per year”. Those are one installer’s statements. SFG20 says it is “the industry standard for building maintenance specification” and was created by BESA in 1990; it lists air conditioning among its equipment types. We did not read any SFG20 task frequencies.
What a contract covers and excludes
Server Room Environments says response tiers are 4 clock hours, 8 working hours or 12 working hours; call-out charges are billed separately and cover travel plus the first hour on site; parts and consumables are charged at cost; and parking, congestion and toll charges are extra. Contracts are priced by postcode or region.
Molesey Air’s annual maintenance service lists: checking and cleaning return air filters, flushing the condensate drain, testing the drain pump if fitted, cleaning the indoor coil and front cover, testing heating and cooling, checking motors and the refrigerant circuit, recording air temperatures, cleaning the outdoor coil and providing a condition and performance report.
Filters and ductwork
Filters are graded under ISO 16890: Freudenberg, a filter maker, says ISO ePM1, ePM2.5 and ePM10 each need at least 50% separation of their particle group, and that EN 779 classes cannot be compared 1:1. See HVAC filters. BESA says DW/144 is the specification for sheet metal ductwork, with leakage testing mandatory for high-pressure ductwork and optional for low and medium, and links TR19 Air to inspecting and cleaning ductwork. See HVAC ductwork.
Costs
- Molesey Air (Surrey): “Commercial AMS from £90 with discounts available on multiple units” and “Commercial DCS from £149 per indoor unit”, with “(Commercial prices are subject to VAT)”. The page does not say whether £90 includes VAT or what it is per. Checked 25 November 2026.
- Aspect (London and inside the M25): repair labour “from £63.00 + VAT” per half hour, one hour minimum, parts extra; see HVAC repair.
- We found no published price for a planned maintenance contract. These are single providers’ prices, not averages.
Records to keep
F-gas records (type and quantity of gas, amounts added or recovered, who worked on the equipment, leak check dates and results, decommissioning steps, per Article 6), the inspection report where one applies, service sheets, any legionella assessment, and the contract itself.
How to brief a maintenance contractor
- Give a list of every unit with make, model, refrigerant type and charge from the rating plate.
- Say how the contractor will reach plant, and which hours it can work.
- State the response time you need, and what you want excluded from call-out charges.
- Ask for F-gas company certification, the task list against each visit, and the reports you will receive.
Frequently asked questions
How often should HVAC be maintained?
In Great Britain the law sets F-gas leak checks by the refrigerant’s CO2 equivalent: at least every 12 months from 5 tonnes (24 with a leak detection system) and every 6 months from 50 tonnes (12 with one); from 500 tonnes the equipment must have a leak detection system and is then checked at least every 6 months. A service beyond that is a matter for the maker’s warranty terms and your maintenance contract. One installer gives twice a year as the manufacturers’ recommendation; read your manual and ask your contractor to put the schedule in writing.
What is a PPM contract?
Planned preventative maintenance: scheduled visits, in one installer’s description typically two a year, with response times and exclusions set in the contract.
What is SFG20?
Its publisher calls it “the industry standard for building maintenance specification”, created by BESA in 1990.
Do I need a legionella risk assessment for air conditioning?
HSE’s duties apply to evaporative cooling and water systems such as cooling towers. HSE does not list air-cooled air conditioning as a source; we found no source that says what applies to your premises, so ask a competent adviser.
What records must I keep?
F-gas records for at least five years if your equipment must be checked for leaks (Article 6 sets this for operators of equipment that must be checked for leaks, which starts at 5 tonnes CO2 equivalent), and where an inspection applies, the report, which GOV.UK says must be kept and passed on.
Who is responsible if the contractor misses a leak check?
GOV.UK says responsibility is shared between users of equipment and the technicians who maintain it, and that if you rent equipment out you “may be responsible for leak checks rather than the end user”, depending on the agreement. Check your contract.
Sources
- legislation.gov.uk: F-gas Regulation (EU) No 517/2014 as it applies in Great Britain, Article 4, Article 5 and Article 6 (checked 25 November 2026)
- GOV.UK: Checking F gas equipment for leaks (checked 25 November 2026)
- US EPA: Technology Transitions GWP reference table (updated 2 April 2026) (checked 25 November 2026)
- GOV.UK: Air conditioning inspections for buildings, a guide (updated 5 November 2026) (checked 25 November 2026)
- HSE: Legionella, workplace risks (checked 25 November 2026)
- HSE: Evaporative cooling systems (updated 14 January 2026) (checked 25 November 2026)
- HSE: How to improve ventilation (checked 25 November 2026)
- legislation.gov.uk: Workplace Regulations 1992, regulation 7 (checked 25 November 2026)
- HSE: Temperature in the workplace (updated 3 November 2026) (checked 27 November 2026)
- Server Room Environments: Air conditioner maintenance contracts (checked 25 November 2026)
- SFG20: What is SFG20 (checked 25 November 2026)
- Molesey Air: Air conditioning maintenance, Surrey (checked 25 November 2026)
- Aspect: Air conditioning repairs (checked 25 November 2026)
- Freudenberg Filtration Technologies: ISO 16890 (checked 25 November 2026)
- BESA: Sheet metal ductwork standards (11 November 2025) (checked 25 November 2026)