Key takeaways
- When choosing an HVAC company in Great Britain, note that GOV.UK says a company that services stationary air conditioning for others “must be certified by an approved body”. The bodies it names for air conditioning are Refcom Certification Ltd, F-Gas Register (Quidos) and Bureau Veritas UK Ltd, and certification must be renewed every 3 years.
- Ask for the company’s certificate number, and ask the certification body to confirm it. GOV.UK’s page lists each body’s contact details, not a public search, and we do not list or recommend any company.
- In England, GOV.UK says you do not need to apply for building regulations approval yourself if you use someone registered with a competent person scheme. For air conditioning in buildings other than homes the schemes named are BESCA, Blue Flame Certification, Certsure and NAPIT.
- Give every company the same brief and compare quotes line by line. Our commercial air conditioning guide has the brief to use.
What is the legal minimum?
This is general information, not legal advice, and covers Great Britain. Northern Ireland follows the EU F-gas system, which we have not covered here.
GOV.UK’s company certification page says “Your company, including sole traders, must be certified by an approved body” to service stationary equipment containing F gas operated by others, including air conditioning. It lists the approved bodies for refrigeration and stationary air conditioning and heat pumps as Refcom Certification Ltd, F-Gas Register (Quidos) and Bureau Veritas UK Ltd, and says “You must renew your company’s certification every 3 years.” A company must also “employ enough trained staff to do the work” and have “a written procedure for how you handle F gases safely and minimise emissions”. A company that services only its own equipment does not need certification.
Individuals need qualifications too. GOV.UK says “For RACHP systems you must have qualifications to” install new systems, service and maintain, check for leaks, recover gases, and decommission and dispose of old systems, and “You must have your own qualifications to work on equipment containing F gas, even if you work for someone else.” See F-gas rules and what an air conditioning engineer is.
How do I check a certificate?
- Ask for the company’s F-gas certificate number and the name of its certification body.
- Contact that body, using the contact details on GOV.UK’s page, and ask it to confirm the certificate is current. We did not find a public lookup on GOV.UK’s page.
- Ask for the engineers’ individual qualifications for the job.
- GOV.UK gives an address for reporting someone working with F gas without the right certification: f-gas-support@environment-agency.gov.uk.
Equipment sellers apply the same rule. Hawco’s page for a Haier cassette says “Refrigeration components sold must be installed by an FGAS certified engineer” and “Failure to provide a valid certificate will result in your purchase being cancelled and payment refunded”. The F-gas Regulation as it applies in Great Britain says, in Article 11(5), that non-hermetically sealed equipment charged with F gases “shall only be sold to the end user” “where evidence is provided that the installation is to be carried out by an undertaking” “certified in accordance with Article 10” (quoted in the three fragments the legislation page shows). Under Article 11(4), F gases for “installation, servicing, maintenance or repair” may only be sold to and purchased by undertakings holding the relevant certificates. So expect a seller of split equipment or refrigerant to ask who will install it, and be wary of one that does not.
What about building regulations?
In England, GOV.UK lists “put in a fixed air-conditioning system” among projects that may need building regulations approval, and says “You do not need to get approval yourself if you use someone registered with a competent person scheme.” For “Mechanical ventilation and air-conditioning systems” in buildings other than homes, GOV.UK’s list (updated 17 September 2026) names BESCA, Blue Flame Certification, Certsure (trading as NICEIC) and NAPIT. Ask which scheme the company is registered with, and ask the scheme to confirm it. Rules in Wales, Scotland and Northern Ireland were not confirmed. See air conditioning and building regulations.
Also ask who will make the electrical connection and what they are registered with; we have not found a source that tells you what to expect, so treat it as a question to ask.
What does a good quote include?
- A heat load calculation for each area.
- The make and model of every unit, with its SEER.
- The refrigerant type and charge, for your F-gas records.
- What the price excludes: builder’s work, electrics, access equipment, making good, removal of old plant, VAT.
- Warranty terms and servicing terms.
- Commissioning and handover documents.
- Insurance cover and references. These are questions to ask; we have no official source that says what a company should hold.
See how to get and compare quotes and commercial air conditioning installation.
What should a maintenance contract include?
One installer’s page (Server Room Environments) says “An annual AC maintenance contract will typically include two preventative maintenance visits per annum”, offers response times of 4 clock hours, 8 working hours or 12 working hours, and says “Call out charges are extra and include travel to site and the first hour on site” and “Any parts and consumables are charged extra at cost as are parking, congestion and toll charges”. Contracts there are priced by postcode or region. That is one provider’s terms, not a standard. Ask any company for visits a year, response times, what is excluded, who keeps the F-gas records and whether the contract covers leak checks. See HVAC maintenance and HVAC repair.
What are the red flags?
- No certificate number, or reluctance to say which body certified it.
- A quote with no heat load calculation, or no make and model.
- No mention of refrigerant records. GOV.UK says that if you find a leak you must “repair it as soon as possible” and “repeat the test within a month”; a quote that only adds gas without looking for the leak does not fit that (our reading).
- No written terms for what the price excludes.
- No answer when you ask who will do the electrical work.
How do I compare quotes?
Give every company the same brief and ask for the same scope. To compare labour, turn any half-hourly or hourly rate into a job cost. Aspect’s page (a single provider, not an average and not a recommendation) says “Half hour rates from £63.00 + VAT” with “One hour minimum”, for Greater London and inside the M25. A 3-hour job at that rate is 6 half hours x £63 = £378 plus VAT, which is £453.60 with VAT at 20% (our arithmetic). Parts are extra, and the page gives no date. Molesey Air’s page (also one provider, in Surrey) says “Commercial AMS from £90 with discounts available on multiple units” and “(Commercial prices are subject to VAT)”; it does not say whether £90 includes VAT.
HVAC company or air conditioning company?
HVAC means heating, ventilation and air conditioning. Designing Buildings says HVAC systems can be used in buildings to “Maintain internal air quality. Regulate internal temperatures. Regulate internal humidity.” A company that calls itself an HVAC company may therefore also do heating and ventilation, while an air conditioning company may do only cooling. Check what each part of your job needs. See what HVAC is.
How to brief an installer
- Floor plans and ceiling heights, people, equipment and hours of use.
- Which rooms need heating, cooling and fresh air.
- Where an outdoor unit could go, and whether your landlord and the council allow it.
- Your electrical supply, and any existing system’s make, model and refrigerant.
- Ask in writing for the items in the quote list above, the F-gas certificate number and the competent person scheme.
Frequently asked questions
How do I check an air conditioning company is F-gas certified?
Ask for its company certificate number and its certification body (Refcom Certification Ltd, F-Gas Register (Quidos) or Bureau Veritas UK Ltd for air conditioning), then ask that body to confirm it.
What is the difference between an HVAC company and an air conditioning company?
HVAC covers heating, ventilation and air conditioning. An air conditioning company may do only the cooling side.
Do I need a company registered with a competent person scheme?
In England, GOV.UK says you do not need to get building regulations approval yourself if you use someone registered with one. Other nations were not confirmed.
How many quotes should I get?
We found no rule. Get enough to compare, with the same brief each time.
What should a commercial maintenance contract include?
Visits a year, response times, what is excluded (call-outs, parts, parking and tolls on one provider’s terms), and who keeps the F-gas records.
Can a company sell me a split system to fit myself?
Article 11(5) of the F-gas Regulation as it applies in Great Britain says non-hermetically sealed equipment charged with F gases can be sold to the end user only where evidence is provided that a certified undertaking will install it. Hawco asks for a valid certificate on its cassette.
Sources
- GOV.UK: Certification for companies working on equipment containing F gas (checked 25 November 2026)
- GOV.UK: Qualifications to work with F gas (updated 3 March 2026) (checked 25 November 2026)
- GOV.UK: Checking F gas equipment for leaks (checked 25 November 2026)
- legislation.gov.uk: F-gas Regulation (EU) No 517/2014 as it applies in Great Britain, Article 11 (checked 25 November 2026)
- GOV.UK: Building regulations approval, when you need approval (checked 25 November 2026)
- GOV.UK: Competent person schemes, current schemes (updated 17 September 2026) (checked 25 November 2026)
- Hawco: Haier 5 kW cassette indoor unit AB50S2SC2FA-H (checked 25 November 2026)
- Server Room Environments: Air conditioner maintenance contracts (checked 25 November 2026)
- Aspect: Air conditioning repairs (checked 25 November 2026)
- Molesey Air: Air conditioning maintenance, Surrey (checked 25 November 2026)
- Designing Buildings: HVAC (last edited 8 September 2026) (checked 25 November 2026)