Key takeaways
- Under the F gas regulations in Great Britain, only an F-gas qualified technician working for a certified company may install, service, leak check, recover refrigerant from or decommission a fixed system containing F-gas, such as an R32 split air conditioner.
- A shop selling you a pre-charged split that is not hermetically sealed must first take, and check, the details of the qualified technician who will fit it. You cannot legally buy refrigerant to top a system up yourself.
- The F-gas rules cover fluorinated gases only. Propane (R290) is not one, and we found no GOV.UK or HSE rule on who may fit a propane split kit.
- Leak checks become compulsory from 5 tonnes CO2 equivalent, which for R32 is about 7.4 kg of refrigerant.
- Northern Ireland follows the EU F-gas rules, not Great Britain’s.
This is general information, not legal advice.
The short answer
You cannot legally fit a split air conditioner containing F-gas yourself in Great Britain: an F-gas certified company has to install it. Planning is a separate question, covered in our guide to air conditioning planning permission; this page covers who may do the work and what owners of larger systems must check and record.
What F gas is and why it is regulated
F gases (fluorinated greenhouse gases) are refrigerants such as R32 that warm the climate if they leak. In Great Britain the law is the retained Regulation (EU) No 517/2014, which defines them as “the hydrofluorocarbons, perfluorocarbons, sulphur hexafluoride and other greenhouse gases that contain fluorine, listed in Annex I”. Our guides to air conditioning gas, R32 refrigerant and air conditioning refrigerants explain the gases themselves.
Can I install air conditioning myself?
Not a split system that contains F-gas. The refrigerant circuit between the indoor and outdoor units has to be connected, and GOV.UK says you must have qualifications to “install new systems”, “service and maintain systems”, “check for leaks”, “recover gases” and “decommission and dispose of old systems”. Article 11(5) of the Regulation adds that equipment that is not hermetically sealed “shall only be sold to the end user where evidence is provided that the installation is to be carried out by an undertaking certified” under the rules. Our pages on DIY air conditioning and self-install air conditioning look at the costs.
The qualification rules are for work on the refrigerant circuit. A portable air conditioner arrives sealed and plugs in, so there is no circuit for you to connect.
What the seller must check
GOV.UK’s guidance for sellers in Great Britain (updated 17 January 2024) says that before selling non-hermetically sealed equipment containing F-gas, the seller must “ask your end user for the details of the qualified technician who will install the equipment”, in writing, and “check that the technician’s details are valid”. It adds: “You do not need to follow these steps for hermetically sealed equipment.”
This is enforced. In Buy It Direct Ltd v Environment Agency (First-tier Tribunal, decided 5 September 2023), an online retailer was found to have sold air conditioning units when “at the time of sale it did not have the evidence it required”. The tribunal upheld the Environment Agency’s civil penalty and reduced it from £42,000 to £37,500.
Propane (R290) self-fit kits
Some split kits are charged with R290 (propane), and sellers say no F-gas engineer is needed. The F-gas rules cover fluorinated gases only, and propane is not one: it appears in Annex IV of the Regulation, the method for working out a mixture’s GWP, with a GWP of 3. But we found no GOV.UK or HSE guidance on who may fit a propane system in a home. HSE’s rules on dangerous substances (DSEAR) put duties “on employers and the self-employed” and name “flammable gases, such as liquid petroleum gas (LPG)”; they do not mention refrigerants or householders.
What we could not confirm. Whether a householder may lawfully fit an R290 split kit. We do not say it is legal or illegal. Follow the maker’s installation instructions, and remember that in England a new electrical circuit is notifiable building work under regulation 12(6A) of the Building Regulations 2010. See our guide to air conditioning and building regulations.
Who can do the work: personal qualifications
GOV.UK says: “You must have your own qualifications to work on equipment containing F gas, even if you work for someone else.” For refrigeration, air conditioning and heat pump systems there are four categories:
| Category | What it covers |
|---|---|
| 1 | All activities |
| 2 | Install, maintain, service and recover refrigerant from systems with less than 3 kg of F-gas (6 kg if hermetically sealed) |
| 3 | Recover refrigerant from those smaller systems |
| 4 | Leak checks that do not break into the refrigeration circuit |
The bodies that issue the qualifications are City and Guilds, the Building Engineering Services Association (BESA) and LCL Awards. GOV.UK notes that CITB no longer issues new F-gas qualifications.
Company certification
A company, “including sole traders”, must be certified “to service stationary equipment containing F gas operated by others”, including air conditioning, and to install, repair, maintain and decommission it. The certification bodies GOV.UK lists for air conditioning and heat pumps are Refcom, F-Gas Register (Quidos) and Bureau Veritas. Certification must be renewed every 3 years. To check an installer, ask for their company certificate number and look it up with the body that issued it.
Leak checks: who needs them and how often
If you use stationary air conditioning or heat pump equipment, you are responsible for getting it leak checked once it holds enough F-gas. The threshold is measured in tonnes of CO2 equivalent:
| F-gas in the system (tonnes CO2 equivalent) | Leak check at least every | With a leak detection system fitted |
|---|---|---|
| 5 to less than 50 | 12 months | 24 months |
| 50 to less than 500 | 6 months | 12 months |
| 500 or more | 3 months | 6 months |
These are the intervals in Article 4(3) of the GB Regulation, which applies them to stationary air conditioning, refrigeration and heat pump equipment among others. At 500 tonnes or more, Article 5(1) requires that equipment to have “a leakage detection system which alerts the operator or a service company of any leakage”, so in practice the check is at least every 6 months. GOV.UK’s table words the 500 tonne row differently: it gives “at least every 3 months” only for electrical switchgear and organic Rankine cycles installed before 1 January 2017, and says other equipment of that size must have automatic leak detection. GOV.UK also says “If you install a system to automatically detect leaks, you can double the period of time allowed between leak checks.” No home system comes near 500 tonnes: for R32 it is about 741 kg of refrigerant (500,000 / 675). Hermetically sealed systems have no set interval unless they hold F-gas equal to 10 tonnes of CO2 or more. If you rent out equipment, you may be responsible for leak checks rather than the user, depending on the agreement.
How to work out tonnes CO2e
Tonnes CO2 equivalent = refrigerant charge in kg x GWP / 1,000.
R32 (HFC-32) has a GWP of 675 in Annex I of the GB Regulation. So:
- The 5 tonne threshold is reached at 5,000 / 675 = 7.41 kg of R32.
- The 50 tonne threshold is reached at 50,000 / 675 = 74.1 kg of R32.
A system holding less than about 7.4 kg of R32 has no compulsory leak check interval under these rules. Ask your installer for the system’s refrigerant charge in kg. If a system ever needs topping up, only a certified company may do it; our guide to air conditioning refills covers what that involves.
Records you must keep
Where leak checks apply, the operator keeps records under Article 6, including “the quantity and type of fluorinated greenhouse gases installed”, quantities added or recovered, who installed and serviced the equipment, and “the dates and results of the checks”. Operators keep them “for at least five years”, and the servicing company keeps copies for the same period.
Bans on new equipment
Annex III of the GB Regulation bans placing these on the market:
- “Movable room air-conditioning equipment (hermetically sealed equipment which is movable between rooms by the end user) that contain HFCs with GWP of 150 or more”, from 1 January 2020.
- “Single split air-conditioning systems containing less than 3 kg of fluorinated greenhouse gases”, using F-gases “with GWP of 750 or more”, from 1 January 2025.
GOV.UK’s table (updated 27 August 2026) words these as “Above 150” and “Above 750”. R32, at 675, is allowed in a new single split. GOV.UK lists four exceptions to the single split ban: larger systems “such as chillers or larger split systems”, single splits used solely for cooling products, air to water single splits, and units on maritime craft. The bans are on placing new products on the market (Article 11(1)), and nothing in them requires a system already fitted to be removed.
What we could not confirm. Portable split units with R32, such as the Midea PortaSplit. The law defines a single split as one outdoor and one indoor unit “needing installation at the site of usage”, and the movable ban covers hermetically sealed units the user can move between rooms. We could not confirm whether the GB rules treat a portable split as a movable unit or a split system, and we found no Environment Agency statement on it.
The HFC phase-down
Separately, the amount of HFC refrigerant that can be supplied in Great Britain is being cut step by step. Defra consulted on a faster schedule but said on 15 May 2026: “we will not legislate in 2026 to change the phasedown steps from 1 January 2027.” The existing schedule continues to apply.
Northern Ireland
GOV.UK says: “Northern Ireland is part of the European Union fluorinated greenhouse gas and ozone depleting substances system.” Great Britain’s dates and thresholds on this page do not apply there. Businesses registered in Northern Ireland should contact the Northern Ireland Environment Agency.
Larger systems: the 5 yearly energy inspection
A different rule applies to bigger systems. GOV.UK says air conditioning systems “with an effective rated output of greater than 12kW must be regularly inspected by an energy assessor”, no more than 5 years apart, in England and Wales. Our guide to TM44 inspections covers it.
What to do next
- Choose an installer with a company F-gas certificate and ask for its number. Our guide to air conditioning installation covers the job.
- If you buy a pre-charged split online, expect the seller to ask for your installer’s details before the sale.
- Ask the installer for the refrigerant charge in kg and whether the system needs leak checks.
- If you rent out equipment or run a business, keep the records for five years.
- Thinking of the grant? It also needs an MCS certified installer; see our grant eligibility checklist and our guide to landlords and air conditioning.
Frequently asked questions
Do you need to be F gas certified to install air conditioning?
Yes, for any system containing F-gas. The technician needs personal F-gas qualifications and the company, including a sole trader, needs company certification from Refcom, F-Gas Register or Bureau Veritas.
Can I buy a pre-charged split system and fit it myself?
No, not one containing F-gas. Unless it is hermetically sealed, the seller must take and check the details of the qualified technician who will install it, and the installation must be carried out by a certified company.
How often does home air conditioning need a leak check?
Only if it holds F-gas equal to 5 tonnes of CO2 or more. For R32 that is about 7.41 kg of refrigerant; from there, the check is at least every 12 months.
How do I check an installer is F gas certified?
Ask for the company’s F-gas certificate number and check it with the body named on it: Refcom, F-Gas Register (Quidos) or Bureau Veritas. Certificates are renewed every 3 years.
Are R410A air conditioners banned?
The ban is on new equipment. Since 1 January 2025, a new single split system holding under 3 kg of refrigerant cannot be placed on the GB market if its F-gas has a GWP of 750 or more; whether that catches a given unit depends on its refrigerant’s GWP, which this page does not give for R410A. The ban is on placing new equipment on the market, and nothing in it requires a system already fitted to be removed.
Do F gas rules apply to portable air conditioners?
Partly. The qualification rules are for work on the refrigerant circuit, which you do not touch with a sealed portable unit. New movable room units cannot contain HFCs with a GWP of 150 or more.
Do I need an F gas engineer for an R290 (propane) split kit?
The F-gas rules do not cover propane, so they do not require one. We found no GOV.UK or HSE rule on who may fit a propane split, so follow the maker’s instructions. In England any new electrical circuit is notifiable building work.
This is general information, not legal advice.
Sources
- GOV.UK: Qualifications required to work on equipment containing F gas (last updated 3 March 2026) (checked 14 November 2026)
- GOV.UK: Certification for companies working on equipment containing F gas (last updated 21 August 2019) (checked 14 November 2026)
- legislation.gov.uk: Regulation (EU) No 517/2014, Article 11 (GB revised version) (checked 14 November 2026)
- GOV.UK (Environment Agency): Selling F gas or equipment (last updated 17 January 2024) (checked 14 November 2026)
- Find Case Law: Buy It Direct Ltd v Environment Agency [2023] UKFTT 808 (GRC), decision given 5 September 2023 (checked 14 November 2026)
- legislation.gov.uk: Regulation (EU) No 517/2014, Article 2 (definitions) (checked 14 November 2026)
- legislation.gov.uk: Regulation (EU) No 517/2014, Annex III (bans) (checked 14 November 2026)
- legislation.gov.uk: Regulation (EU) No 517/2014, Annex IV (propane R-290, GWP 3) (checked 14 November 2026)
- HSE: Dangerous Substances and Explosive Atmospheres Regulations (DSEAR) (updated 14 October 2024) (checked 14 November 2026)
- legislation.gov.uk: Building Regulations 2010, regulation 12 (England) (checked 14 November 2026)
- GOV.UK: Checking F gas equipment for leaks (published 21 August 2019) (checked 14 November 2026)
- legislation.gov.uk: Regulation (EU) No 517/2014, Article 6 (records) (checked 14 November 2026)
- legislation.gov.uk: Regulation (EU) No 517/2014, Annex I (HFC-32 GWP 675) (checked 14 November 2026)
- GOV.UK: Bans on F gas in new products and equipment (last updated 27 August 2026) (checked 14 November 2026)
- GOV.UK (Defra): Amending the hydrofluorocarbon phasedown schedule, government response (15 May 2026) (checked 14 November 2026)
- GOV.UK: EU F gas regulation guidance for users, producers and traders (last updated 12 May 2025) (checked 14 November 2026)
- GOV.UK: A guide to air conditioning inspections for buildings (updated 5 November 2026) (checked 14 November 2026)
- legislation.gov.uk: Regulation (EU) No 517/2014, Article 4 (leak check frequencies) (checked 14 November 2026)
- legislation.gov.uk: Regulation (EU) No 517/2014, Article 5 (leakage detection systems) (checked 14 November 2026)